02 / Land

Where the power position is the asset.

Deliverable capacity, not acreage, decides which projects get built. We evaluate, secure and advance sites for AI campuses and energy-intensive industry on the strength of their power position.

  • Land
  • Power
  • Compute
Discuss a requirementScroll down to view more content

The problem.

Most sites are sold on what they are, not on what they can power.

  1. 01
    Acreage, not megawatts.

    Sites are marketed on size and location; the deliverable power is assumed rather than evidenced.

  2. 02
    Queue uncertainty.

    Interconnection applications and studies of unknown status can add years to a project.

  3. 03
    Late surprises.

    Site control, title and zoning issues surface after capital has been committed.

  4. 04
    Mismatched plans.

    Compute and cooling plans are drawn up without reference to the power the site can actually take.

Our approach.

We start from the power position and work outwards.

  1. 01
    Power first.

    Capacity, interconnection status and timeline are established before anything else.

  2. 02
    Screened to your load.

    Sites are assessed against your compute or industrial load profile, not generic criteria.

  3. 03
    Structured control.

    Options and acquisitions are structured to secure the site while diligence completes.

  4. 04
    One integrated plan.

    Land, power and compute are planned together so no layer constrains the next.

Who this is for.

Clients

  • AI and hyperscale data-centre developers
  • Infrastructure and real-asset funds
  • Landowners with grid access
  • Energy-intensive industrial operators

Scope of work

  • Power and interconnection position assessment
  • Site screening against compute and industrial load
  • Site control, title and zoning review
  • Option and acquisition structuring
  • Capacity planning against GPU and cooling load

How an engagement runs.

Nothing moves to the next stage until the current one is evidenced.

  1. 01
    Requirement.

    Load profile, timing, location criteria and budget defined.

  2. 02
    Screen.

    Candidate sites assessed on deliverable power and interconnection position.

  3. 03
    Verify.

    Site control, title, zoning and capacity evidence reviewed.

  4. 04
    Secure.

    Option or acquisition terms negotiated and documented.

  5. 05
    Advance.

    Power, equipment and compute workstreams sequenced towards energisation.

Tell us what your load needs.

Share the capacity, timing and location criteria. We will tell you what is realistically available.