01 / Equipment

Long-lead power equipment, located, verified and secured.

Turbines and transformers now set the energisation date. We are mandated by the buyer to find the equipment, prove it exists and who controls it, and secure it on terms that protect your capital.

  • Equipment
  • Power
  • Execution
Discuss a requirementScroll down to view more content

The problem.

A market crowded with unverified inventory.

  1. 01
    Multi-year lead times.

    New transformers and generation sets are quoted years out, while energisation dates do not move.

  2. 02
    Broker chains.

    Several intermediaries can sit between the buyer and the party that actually controls the equipment, each adding cost and risk.

  3. 03
    Unproven equipment.

    Specification, condition and provenance are asserted but cannot be evidenced.

  4. 04
    Capital at risk.

    Deposits are requested before ownership has been confirmed.

Our approach.

Retained by the buyer only — so we can go direct to owners, insist on evidence, and walk away from packages that cannot be substantiated.

  1. 01
    Buyer-side only.

    We are retained by the buyer. Our interest is your outcome.

  2. 02
    Direct to owner.

    Chains are removed so you negotiate with the party that controls the asset.

  3. 03
    Evidence before terms.

    Title, specification and condition are confirmed before commercial terms are agreed.

  4. 04
    Milestone-protected capital.

    Payments are released against inspection and delivery, not promises.

Who this is for.

Clients

  • Data-centre and industrial developers facing interconnection timelines
  • Independent power producers assembling generation capacity
  • EPC contractors sourcing against a committed build schedule
  • Owners needing bridging capacity ahead of grid energisation

Scope of work

  • Gas and steam turbines, reciprocating generation sets
  • Power transformers and substation equipment
  • Switchgear, breakers and balance of plant
  • Ownership, specification and condition verification
  • Purchase structuring, inspection, logistics and 50/60 Hz conversion pathways

How an engagement runs.

Nothing moves to the next stage until the current one is evidenced.

  1. 01
    Requirement.

    Specification, tolerances, timing and budget defined with you.

  2. 02
    Source.

    The market worked directly; parties without control are screened out.

  3. 03
    Verify.

    Title, condition, specification and availability documented.

  4. 04
    Structure.

    Purchase terms, inspection rights and staged payments agreed.

  5. 05
    Deliver.

    Logistics, release points and delivery managed through to site.

Tell us what your schedule needs.

Share the specification and the required on-site date. We will tell you what the market can realistically deliver.